The beauty of Hilton Saigon
In the end of a long journey, Hilton Saigon has also gradually reached the final step and is in the stage of completing the podium.
At each stage in the project implementation, from constructing unitized facades to the crown and now the podium, there are difficulties and complexity in the construction method. With the base block in every detail, the Investor requires high level of precision which means very small construction error. The size of the Hilton is large and relatively heavy while the construction space is small, making it difficult to find construction methods.
Especially, this is the Semi-unitized system linked to the steel structure system. When installed, it is difficult to be exactly fit, so the Project Steering Committee has to closely monitor the construction process to ensure the steel structure is installed carefully.
related news