Skip to main content

Showroom

AREUS ATELIER

8 Le Ngo Cat Street, Dist. 3, Ho Chi Minh City

BM WINDOWS

68A Hoang Hoa Tham Street, Binh Thanh Dist., Ho Chi Minh City

Office

HO CHI MINH CITY

Newtecons Tower 96 Phan Dang Luu St., Ward 5, Phu Nhuan Dist.

HA NOI

67A Truong Dinh Street, Hai Ba Trung Dist.

Improving The Peak project

During the implementation of The Peak project that is invested by the Phu My Hung Corporation, great attention to detail was paid at every stage. What is special about this project is the unique and careful methods applied by BM Windows. Each items, after being installed, is to be protected by a system of plastic profile, appropriate to the stage; frame installation, glass installation, gasket installation and finishing.

Perspective drawing of The Peak project

BM Windows’ products at The Peak

All balconies are covered with canvas after installations were complete.

In addition, and depending on the process, The Peak’s balconies will be protected with methods such as drilling and installing with chemical bolts, erecting balusters, and installing glass. All balconies are then covered with canvas after the installation is complete. BM Windows is working diligently to meet Phu My Hung Corporation’s strict requirements for this project.

tags