BM WINDOWS Team Visits The One Toronto Project

the-one-bm-windows

Witnessing the beauty of The One Toronto firsthand is an indescribable source of happiness and pride for the BM WINDOWS team. After dedicating our full passion and effort to this project, seeing the collective results - façade panels installed on the new Canadian landmark - serves as a powerful motivation for BM WINDOWS to continue striving on the international stage.


Supervising the meticulous monitoring of the construction process

From the container trucks transporting BM WINDOWS façade panels to the construction site, the packages are lifted to each floor according to the project's construction schedule. At the staging area, workers proceed to install each panel in its designated position.

A pack of façade panels fabricated by BM WINDOWS was being lifted for installation at the site.

The entire process, from manufacturing to transportation to installation, is seamlessly coordinated by BM WINDOWS. The thorough attention to detail at every step ensures that BM WINDOWS upholds the project's quality standards as commitment.


Participating in quality inspection of The One's façade directly at the construction site

After a comprehensive evaluation of aesthetics and functionality, BM WINDOWS conducted a direct quality inspection of The One's façade within a sealed chamber constructed at the project site. The inspection session involved the investor, the main contractor, the façade consultant, the façade contractor, and the project manager.
 

 

Using field water spray testing according to ASTM standards, with the sealed chamber reaching a pressure of 300 Pa (American standard), BM WINDOWS’ façade products demonstrated high quality and excellent waterproofing capabilities after a long journey to Canada. The successful inspection results brought satisfaction to the investor and all participating parties, once again affirming BM WINDOWS' capabilities in this iconic project.


Mr. Dustin Tran (Mr. Tran Thanh Dung), the Managing Director of BM WINDOWS, participated in the water leakage test at the site.

Beyond the uniquely distinct beauty of the façade, The One Toronto symbolizes the spirit of international collaboration. Spanning across various geographical horizons, BM WINDOWS is proud to join hands with global partners in creating a new urban masterpiece for Canada.