Skip to main content

Showroom

AREUS ATELIER

8 Le Ngo Cat Street, Xuan Hoa Ward, Ho Chi Minh City

BM WINDOWS

68A Hoang Hoa Tham Street, Gia Dinh Ward, Ho Chi Minh City

Office

HO CHI MINH CITY

Newtecons Tower, 96 Phan Dang Luu Street, Duc Nhuan Ward, Ho Chi Minh City

HA NOI

67A Truong Dinh Street, Tuong Mai Ward, Hanoi

Assembly Process of Terracotta Panels for the 55 Pitt Street Project, Sydney

At 55 Pitt Street, the terracotta façade system is a core element in the project’s sustainability strategy, serving as a key factor in achieving leading global green certifications such as NABERS Energy, WELL Core & Shell Platinum, and 6-Star Green Star.

 

 

At the heart of Sydney, 55 Pitt Street is taking shape as a new sustainable landmark, where the terracotta façade system plays a key role in both aesthetic expression and environmental performance.

As one of the most favored contemporary façade materials, terracotta strikes a perfect balance between natural beauty and functional efficiency.
With its warm tones, refined texture, and excellent thermal insulation properties, terracotta not only gives the façade a timeless and enduring appearance, but also contributes to enhancing energy efficiency and indoor comfort for the building.

 

 

 

At 55 Pitt Street, the terracotta façade system is a core element in the project’s sustainability strategy, serving as a key factor in achieving leading global green certifications such as NABERS Energy, WELL Core & Shell Platinum, and 6-Star Green Star. The assembly and inspection process for the terracotta panels at BM Windows is conducted in strict compliance with the technical standards required for a world-class green building project in Sydney.
From raw material inspection, panel assembly, testing, to QA/QC procedures, every stage is meticulously supervised to ensure maximum precision, durability, and aesthetic quality throughout the entire façade system.

 

At 55 Pitt Street, the terracotta façade system is a core element in the project’s sustainability strategy, serving as a key factor in achieving leading global green certifications such as NABERS Energy, WELL Core & Shell Platinum, and 6-Star Green Star.

 

The first batches of terracotta panels have been successfully tested and dispatched, witnessed by representatives from the Developer, Consultants, Design Team, and International QA/QC Specialists — marking an important milestone in BM Windows’ journey to bring the green vision of 55 Pitt Street to life.

tags

"Green" factory Manufacturing process